Compare conveyor belt offers against one requirement revision, identify technical departures first, and align quantity and supply boundaries before comparing price. An unpriced or unconfirmed difference remains an open decision, not an assumed saving.
For hot clinker or sinter, review the exposure record with the complete belt construction and conveyor conditions. Keep continuous material, temporary peaks and belt-surface temperatures distinct, then ask which offered compound, carcass and joining basis match that duty.
A useful conveyor belt RFQ separates documented requirements, observations and missing inputs. Identify the belt and duty, assign each uncertainty to the right reviewer, and state whether you need preliminary guidance or a defined quotation.