Related published guidance, grouped by the product line it supports.
Match each document to the specific claim it supports: a product description, a result for an identified specimen, or certification of a stated scope. More files do not close an evidence gap if they concern a different item or question.
Hardness is one material property, not a wear-lining selection rule. Compare the actual damage and mounting duty with identified material evidence measured on a compatible basis before choosing a lining.
A liner enquiry needs both a material requirement and an installation drawing. Keep rubber, ceramic-rubber, polymer and PTFE proposals separately identified; one liner photograph or a neighbouring catalogue paragraph cannot establish another material’s suitability.
Describe production, cleaning and occasional exposures as separate operating states. Ask for a lining proposal against the complete exposure record, including unknown media and relevant pressure or vacuum conditions; a primary process-fluid name is incomplete.
A rock-box proposal changes the material-contact arrangement by intentionally retaining material. Review flow, geometry, retained load, attachment and access with the equipment authority before treating it as a sheet-thickness substitution.
Assign custody, the applicable preservation documents and a pre-service review before lined equipment is held between delivery and use. Receipt of the item does not establish that later storage, installation and return to service have been accepted.